400 meters long: The new infrastructure facility being built in the Jerusalem hills
A giant regulation pool, 400 meters long, is being built in the Jerusalem hills, the first of its kind in Israel, to deal with extreme fluctuations in the amount of wastewater from the capital. The smart system will include automatic control, controlled flushing, and integration of weather forecasts, and will be hidden in the landscape.
A new infrastructure facility, 400 meters long, is being built in the Jerusalem hills, the first of its kind in Israel. It is a smart regulation pool for raw wastewater, designed to handle extreme fluctuations in the amount of wastewater arriving from the capital, especially on Friday evenings and holidays when consumption increases. The pool, 400 meters long and 25 meters wide, will be divided into four separately flushable sections and operated by a smart control system that analyzes flow patterns and weather forecasts. The facility will be buried underground and landscaped to blend into the Sorek Stream environment. The project is expected to improve the stability of wastewater treatment and reduce risks to equipment.
400 meters long: The new infrastructure facility being built in the Jerusalem hills